Structural steel · Industrial fabrication

Steelwork engineered for fabrication and site erection

SOEX supplies primary and secondary steel structures for plants, terminals and infrastructure — with controlled detailing, material traceability, welding, NDT, surface protection and delivery sequencing.

Project-specificCapacity matched to tonnage and schedule
TraceableHeat number to erection mark
Weld controlledWPS · PQR · welder qualification
Ready to erectMarked, packed and sequenced

Fabrication scope

The manufacturing route is selected against structure type, steel grade, unit weights, total tonnage, coating system, certification, delivery geography and erection sequence.

ST/01 · PROCESS

Pipe racks

Multi-level racks, trestles, bracing, access steel, equipment supports and modular transport splits.

ST/02 · ACCESS

Platforms & walkways

Operating platforms, stairs, ladders, handrails, grating, toe plates and maintenance access systems.

ST/03 · BUILDINGS

Industrial buildings

Process, compressor, utility, warehouse and workshop frames with secondary steel and envelope interfaces.

ST/04 · SUPPORT

Equipment structures

Vessel, exchanger, air-cooler, skid and cable-support steelwork coordinated with equipment loads and interfaces.

ST/05 · MODULES

Module steel

Process-module frames, lifting points, temporary transport steel, sea-fastening interfaces and assembly control.

ST/06 · SECONDARY

Secondary steel

Pipe shoes, guides, frames, brackets, embeds, edge protection, miscellaneous supports and connection items.

ST/07 · MARINE

Marine structures

Jetty and berth steelwork, access structures, dolphins, pile accessories and corrosion-protected assemblies.

ST/08 · HEAVY

Heavy assemblies

Built-up girders, trusses, transfer structures and fabricated sections requiring controlled geometry and lifting plans.

ST/09 · SUPPLY LOT

Steel packages

Multi-building or multi-area lots under one material, inspection, coating, packing and document-control plan.

Technical basis

SOEX does not publish a single generic tonnage limit because capacity depends on section size, piece weight, fabrication complexity, coating, shipping dimensions and schedule. A project-specific capability matrix is issued against each RFQ.

Engineering inputs

Design drawings or model, load data, connection philosophy, design life, steel grades, execution class, tolerances, fireproofing and coating requirements, transport envelope and erection sequence.

Standards

Project-selected requirements such as EN 1090, EN 1993, ISO 3834, AWS D1.1, AISC, GOST/SP and client specifications. Applicability and certification are confirmed before award.

Detailing

Fabrication drawings, connection details, NC data, material take-off, bolt lists, erection marks, model coordination and controlled drawing revisions.

Materials

Carbon and low-alloy structural grades to the project specification, supported by mill certificates, receiving inspection and heat-number traceability.

Capacity statement

For each enquiry: available monthly throughput, maximum member dimensions and weight, shop bay and crane limitations, blasting/painting capacity, trial-assembly area and committed production window.

Manufacturing controls

Fabrication proceeds under an approved quality plan with defined inspection points and acceptance criteria.

QC/01

Material traceability

Certificate review, heat-number transfer, controlled cutting, material identification and reconciliation against the bill of materials.

QC/02

Welding

Approved WPS/PQR, qualified personnel, consumable storage, preheat/interpass control, weld maps and repair control.

QC/03

NDT

Visual inspection plus MT, PT, UT or RT at the extent and acceptance standard specified by design and execution class.

QC/04

Dimensional control

Member geometry, hole patterns, camber, fit-up, interface dimensions, survey reports and trial assembly where required.

QC/05

Bolting

Bolt certification, assembly controls, preloaded-bolt procedures, tension verification and lot traceability as applicable.

QC/06

Coating

Surface preparation, climatic checks, abrasive control, DFT measurement, holiday testing when specified and repair records.

Surface protection

Protection systems are selected for the corrosivity category, design life, operating temperature, fire scenario and site repair strategy.

SP/01

Protective coating

Abrasive blasting and multi-coat systems with stripe coating, DFT control and traceable paint batches.

SP/02

Galvanizing

Hot-dip galvanizing for suitable secondary steel, grating, handrails and supports, including vent/drain detailing.

SP/03

Fire protection

Interfaces for cementitious or intumescent passive fire protection, including preparation and hold-point coordination.

Typical coating records: material and product data, batch certificates, blast profile, surface cleanliness, ambient conditions, wet/dry film thickness, adhesion or holiday testing when specified, and repair/close-out reports.

Package execution

Production and delivery are structured around the site need date and erection logic.

01

Scope review

Tonnage, piece list, standards and schedule.

02

Shop match

Capacity, equipment, certification and load.

03

Detailing

Drawings, model, connections and interfaces.

04

Fabrication

Traceability, welding, NDT and coating.

05

Delivery

Marking, packing, dossier and sequence.

RFQ checklist: drawings/model, bill of materials, steel grades, estimated tonnage, standards and execution class, coating/fireproofing specification, NDT extent, maximum shipping dimensions, delivery location, erection sequence and required-on-site dates.

Define the steel package. We will qualify the route.

SOEX will map fabrication capacity, certification, inspection and delivery constraints before proposal.