Structural steel · Factory-applied passive fire protection

Steel fabrication.
Factory protection.
Site repair.

Coordinate fabrication and factory-applied fire protection with protected transport, site repairs before erection and final coating inspection after installation. SOEX aligns the scope, technical submissions and delivery sequence with your project team.

Rows of structural steel members and a coating applicator inside a production hall
Factory coating work · frame from footage supplied by SOEX. System and inspection details are available through project records.

Plan protection
from shop to site

Bring suitable coating work into the factory and plan the remaining site work before steel leaves the shop. The selected system, handling limits and repair procedure must be accepted for the actual members and destination conditions.

01

Agree the design basis

Review the member schedule, fire-resistance requirement, section factors, critical steel temperature and exposure. Agree the full coating system and approval responsibilities.

02

Fabricate & coat

Coordinate fabrication checks, surface preparation and the approved shop coating scope. Plan connection exclusions, curing, thickness checks and member identification.

03

Protect for transport

Define curing release, supports, packing, lifting points and shipping sequence for the selected system. Record condition at dispatch and inspect on receipt.

04

Repair before erection

Inspect accessible members at ground level. Repair transport and handling damage under an approved procedure; verify preparation, layer compatibility, thickness and curing before release.

05

Inspect after installation

Review connection zones and any lifting or erection damage. Complete agreed touch-ups and outstanding site-applied areas, subject to access and coating conditions.

06

Close out the records

Reconcile member and coating records, repair maps, inspection reports and final acceptance. Agree the responsible reviewer and handover dossier before work starts.

Responsibility at each stage: SOEX coordinates the agreed scope with the fabricator, coating manufacturer, applicator and EPC team. Site repair execution, access equipment, inspection and acceptance responsibilities are defined in the proposal and contract.

Where this approach
can help

Evaluate the route against your erection sequence, site access and selected coating system. Programme and cost effects are assessed against the actual project scope.

SHOP / CONTROL

Earlier coating inspections

Plan preparation, application conditions and thickness checks in the factory before shipment, with records linked to the steel members.

SITE / ACCESS

Ground-level repairs

Complete suitable repairs before erection while members are accessible. Retain a defined plan for connection zones and damage discovered after installation.

PACKAGE / INTERFACES

Clear handover points

Connect fabrication release, coating acceptance, packing and site receipt to one document register and an agreed responsibility matrix.

Executed supply.
Practical expertise.

SOEX Hong Kong has completed four structural steel supply contracts with a total contract value of RMB 46 million and a delivered volume of 4,000 tonnes from China. Completed equipment-supply agency projects include Kovdorsky GOK and Daltransugol.

Manufacturing and specialist execution: structural steel supply is organized with HEILONGJIANG ZHONGJIE COATED STEEL CO., LTD., Harbin region, China. Fire-protective coating application at the facility was carried out by the SOEX Hong Kong technical team. The 4,000-tonne figure represents total steel supply; it is not a claim that the full volume received fire protection.
One interfaceFabrication, coating and delivery coordination
Approval firstAgree the document and acceptance route
TraceableMember, material and coating records
Site sequencedDelivery lots aligned to erection priorities

Reduce the EPC coordination load

For terminals, airport buildings and infrastructure packages, a purchase order must connect design, fabrication, fire protection and site acceptance. SOEX proposes a coordinated route with defined responsibilities and deliverables before award.

01 / DEFINE

Close technical gaps

Review drawings, grades, connections, fire-resistance requirements and coating environments. Track clarifications and deviations before manufacturing.

02 / QUALIFY

Match the supply route

Assess fabricator capability, coating application arrangements, inspection needs and capacity against package requirements.

03 / CONTROL

Manage the interfaces

Coordinate document submissions, manufacturing and inspection milestones, coating records and delivery lots through one package interface.

Specify the complete coating system

Fire protection is selected for the actual steel members and exposure conditions. A generic number of minutes is not a substitute for project-specific design and approval.

Design basis

Required fire resistance, test/design standard, member section factor, critical steel temperature, exposure sides, fire scenario and operating environment.

Compatible system

Surface preparation, primer, any intermediate layer, fire-protective material and topcoat must form an accepted system. Product substitutions require technical review.

Application planning

Agree shop versus site application, connection zones, transport protection, site touch-up, drying/curing conditions and coating thickness verification.

Inspection records

Agreed ITP, batch identification, ambient-condition records, surface-preparation checks, thickness reports and repair/close-out records.

Coating work
on video

Footage supplied by SOEX shows rows of structural steel members and coating application inside the production hall.

Factory footage · 23 seconds · no audio

See the coating work in context

The camera moves along rows of steel members resting on supports. A coating applicator works beside the members, with other structures and coating containers visible in the production area.

Product identity, specified thickness and inspection acceptance are documented in the project records. Fire-resistance performance is established through applicable test and design evidence.

Coated members
in the workshop

A second walkthrough shows rows of structural members with visible coating finishes, connection plates and identification markings.

Factory footage · 22 seconds · no audio

View the members and connection details

The camera passes several rows of steel members on supports. Coating surfaces, end plates and connection details can be seen from different angles.

The footage illustrates the workshop stage. Member release, coating thickness and acceptance are confirmed through the agreed inspection records.

Inside the Harbin workshop

Selected frames from SOEX-supplied footage show rows of structural members, coating work and connection details inside the workshop.

Frames extracted from the original footage illustrate the workshop and visible coating stages. The coating product, layer thickness, inspection acceptance and fire-resistance performance are established by project records and test evidence, not by appearance. Factory identity and project details can be discussed during supplier qualification.

Project-specific manufacturer mandates

Authorization copies are available through qualification channels. The mandates are project-specific; product suitability, fire performance, approval and final contractual responsibilities are reviewed separately for each package.

Heilongjiang Zhongjie

The manufacturer’s letter dated 28 October 2026 appoints SOEX Engineering Hong Kong as its engineering integration, procurement and commercial partner for the project identified in the authorization. It provides for fabrication to approved drawings and inspection plans under SOEX technical coordination.

Judong / SINGAL PAINT

MAF Rev.2 dated 6 November 2026 identifies TPCO Global as the prime commercial vendor and SOEX Engineering Hong Kong as the technical integration partner and QA/QC coordinator for the project identified in that letter.

Define the approval dossier before production

SOEX coordinates the document register and submission schedule. The EPC, designer, manufacturer and any local conformity specialist must agree who prepares, reviews and accepts each item.

DOC / STEEL

Fabrication dossier

Approved shop drawings, material certificates, traceability, welding qualifications, inspection/NDT records, dimensional reports and packing lists, as specified.

DOC / FIRE

Fire-protection dossier

Product data, applicable certificates and test reports, thickness design basis, system compatibility, application procedure and coating inspection records.

DOC / ACCEPTANCE

Local acceptance route

Identify destination-country requirements, translations, required local assessments and submission responsibilities with EPC-appointed specialists before procurement.

Uzbekistan projects: Russian or EAEU certification is supporting evidence and does not establish automatic acceptance in Uzbekistan. Any local permits, conformity assessment and project approval requirements must be verified for the selected system. SOEX coordinates the agreed documentation scope; approval decisions remain with the designated reviewers and competent bodies.

Plan delivery around installation

Supply lots should support the erection sequence and the protection system’s handling requirements.

01

Requisition

Drawings, quantities, standards and dates.

02

Approval plan

Document matrix, responsibilities and hold points.

03

Production

Fabrication, coating and inspections.

04

Release

Close-out records, marking and packing.

05

Site delivery

Sequenced shipments and agreed repair scope.

Start before the final RFQ

At pre-bid stage, send the available project information. We can identify missing technical inputs and propose a supply and documentation route for discussion.

Useful inputs: drawings/model, approximate tonnage, member schedule, steel grades, required fire resistance, exposure conditions, coating specification, delivery location, erection dates and the EPC’s vendor/document requirements.

Questions before
procurement

Resolve the system and application route before committing the fabrication and shipping programme.

Can every fire-protective system be applied before shipment?

The route depends on the selected product and approved system, curing and transport limits, member geometry, exposure and handling arrangements. Factory application is reviewed with the coating manufacturer and the designated project reviewers.

Does factory application remove all site coating work?

The scope still needs an agreed plan for transport damage, connections, areas excluded from shop application and damage caused during erection. Suitable repairs can be completed at ground level before installation, followed by post-erection inspection and any remaining work.

What establishes the required fire-resistance performance?

Applicable test evidence and project-specific thickness design must cover the selected system, member section factors, critical steel temperature and exposure. The final specification and acceptance route are agreed with the designated reviewers.

What information is needed for an initial review?

Send the project country, structure type, available tonnage or member schedule, required fire resistance, exposure, proposed coating specification and erection dates. Drawings can follow through the agreed project email channel.

Initial technical enquiry

Review your
steel protection package

Share the available scope so we can identify technical inputs, interface responsibilities and the proposed factory-to-site route.

For drawings and attachments, contact projects@soexeng.com.

This form accepts initial text enquiries. Please send confidential technical documents through an agreed project channel.

* Required fields. By submitting you agree to the privacy policy. Form processing: FormSubmit; delivery to info@soexeng.com.

Bring the steel and fire-protection interfaces together.

Discuss scope, documentation and delivery with the SOEX project team.

Request a scope review